Files
ERP-core/Backend/PROGRESS.md
ImanThiyanga 4e84a15db7 feat: Implement procurement services and number sequence management
- Added INumberSequenceService interface for generating document numbers.
- Created NumberSequenceService to handle atomic document number issuance.
- Introduced IPurchaseOrderService interface and implemented PurchaseOrderService for managing purchase orders.
- Added IRequisitionService interface and implemented RequisitionService for handling requisitions.
- Created IRfqService interface and implemented RfqService for managing RFQs and vendor quotations.
- Defined necessary DTOs and domain entities for procurement processes.
- Ensured proper validation and error handling across services.
2026-07-13 10:28:58 +05:30

10 KiB
Raw Permalink Blame History

Backend — PROGRESS (Phase 1: Inventory & Supply Chain)

Legend: [ ] not started · [~] in progress · [x] done Spec: docs/10-BACKEND-PHASE1.md (model + rules) · docs/11-BACKEND-PHASE1.md (API) Convention: docs/01-DOC-GUIDE.md §6. Update this file in the same commit as the code. When ticking [x], append a short note + any deviation.

0. Bootstrap

  • Solution + Web API project (net10.0), packages restored (00-CORE §5.4)
  • Folder structure per 00-CORE §5.3
  • ErpDbContext + Npgsql wired; InitialCreate migration created and applied (2026-07-10, 8 master-data tables). /healthHealthy.
  • Serilog, JWT, Swagger, HealthChecks, ProblemDetails in Program.cs (JWT bearer validated; endpoints not yet [Authorize]-gated — see §6 auth note)
  • IUnitOfWork + UnitOfWork (transaction boundary)
  • Generic repository base + interfaces
  • ICurrentUser (audit stamp from token sub)
  • ProblemDetails middleware + domain exception → code mapping (System/Errors; full §7 catalog added to ErrorCodes)

1. Master Data

Code complete for all items below (2026-07-09). Live smoke test PASSED against Postgres (2026-07-10): create/get/list/update/status/reorder/uom-conversions across all 5 controllers; ETag round-trip 200 / stale→412 / missing→428; SKU_DUPLICATE→400; bad reference→422; missing-field→400 ValidationProblemDetails; category ?tree=true nesting; pageSize=9999 clamped to 200; deactivate via PATCH status→204. Still [~] (not [x]) for one reason: the security gate (00-CORE §8) — the foundational auth control (02-SECURITY B.1) and the audit trail (B.3, the AR-01 compensating control) land in §6. Flip to [x] once §6 auth+audit are wired.

  • Item: entity + config + enums (ItemType, TrackingMode; EntityStatus added) — xmin/RowVersion concurrency token (Npgsql), unique SKU
  • [~] Item: repository (generic) + service + controller (CRUD, narrow DTOs, ETag/If-Match→412, SKU_DUPLICATE, reference validation) — server-controlled fields excluded (02-SECURITY C.1)
  • [~] UOM + UOM conversions (GET/POST /uoms, PUT /items/{id}/uom-conversions full-replace upsert)
  • [~] Category (hierarchy, GET /categories?tree=true nested build, parent-exists validation)
  • [~] Vendor (CRUD, ETag/If-Match, unique code, deactivate via PATCH /vendors/{id}/status)
  • [~] Warehouse + Bin (/warehouses, nested /warehouses/{id}/bins, bin code unique per warehouse)
  • [~] Item reorder settings (PUT /items/{id}/reorder full-replace upsert, warehouse-exists validation)

2. Procurement

Requisition/RFQ/PO implemented 2026-07-10. Live smoke test PASSED (docNo PR/RFQ/PO-2026-##### gap-controlled + incrementing, requestedBy/createdBy = seeded system user, RFQ comparison matrix, duplicate quotation→409, PO auto-approve + server-computed totals matching the spec example 112100/20178/132278, edit-while-open with recomputed totals + ETag 200/412, PO_NOT_EDITABLE→409 on cancelled, cancel→200, bad reference→422). Same [~] reason as §1: the §6 security gate (auth + audit) is not yet wired.

  • [~] Requisition (+ lines) + submit (POST /requisitions, /{id}/submit, list, get)
  • [~] RFQ + quotations + comparison (POST /rfqs, /{id}/quotations [one per vendor], GET /{id}/comparison matrix)
  • [~] Purchase Order: create (auto-approve, approvalRequired flag), edit-while-open (If-Match), approve (no-op), cancel
  • Purchase Return (outbound movement, reason code) — deferred: needs GRN lines + stock ledger/FIFO (§3/§4). Build with those.

Deviation (recorded): VendorQuotation is modelled as header + VendorQuotationLine (per-item pricing) to satisfy the API contract (docs/11 §3.2); docs/10 Part C.2's scalar VENDOR_QUOTATION(unit_price, lead_days) with no item ref cannot represent it. Update the ER model doc to match. RFQ vendorIds are validated for existence but not persisted (no RFQ↔vendor link in the model); quotations reference vendors directly.

3. Goods Receipt

  • GRN create (against PO / direct), over-receipt tolerance
  • GRN confirm → FIFO layer + ledger + PO qtyReceived (single UoW txn, Idempotency-Key)
  • Inspection hold release / reject

4. Stock Core

  • StockLayer + StockLedger entities/config (ledger append-only)
  • FifoCostingService (consume oldest-first with row lock; valuation)
  • Stock enquiry (onHand / available / onHold / inTransit)
  • Ledger query · Valuation query

5. Stock Transactions

  • Transfer: create → dispatch (consume, In-Transit) → receive (dest layer, cost-preserving)
  • Adjustment (auto-post, mandatory reason code)
  • Count (cycle/full → enter counts → variance → post)
  • Reorder alerts (query) + suggest requisition

6. Cross-cutting

Auth-enforcement gap (open): JWT bearer validation is wired, but no token issuer exists yet and controllers are not [Authorize]-gated, so §1 endpoints are currently open. This is the AR-01/NFR-03 control surface — gate all v1 endpoints (fallback authorization policy) in the same change as POST /auth/login, then re-run the 02-SECURITY B.1 checklist and flip §1 items to [x].

  • Audit log on every mutation (who/when/old→new)
  • Document numbering sequences (per type, per year) — NumberSequence + NumberSequenceService (atomic INSERT … ON CONFLICT … RETURNING inside the doc's UoW txn; gap-controlled). Verified issuing + incrementing PR/RFQ/PO.
  • [~] Auth: simple in-app login → JWT (POST /auth/login) — foundation only: User table + seeded system user (id 1) exist and ICurrentUser.AuditUserId stamps docs; login endpoint + [Authorize] still pending.
  • JournalEntryStub emitted per stock movement (data only)
  • Negative-stock policy enforcement (default block)
  • FEFO picking for perishables; block expired / on-hold issue

Deferred (Phase 2+ — do NOT build now, hooks only)

  • Vendor invoice + three-way match
  • Reservation/allocation fulfilment
  • RBAC policy enforcement + approval workflow activation

Done

2026-07-09 — Bootstrap verified + Master Data (§1) implemented

  • Bootstrap scaffolding confirmed against 00-CORE §5 (solution, packages, Program.cs wiring, UoW, generic repo, ICurrentUser, ProblemDetails handler). Added enum-as-string JSON (JsonStringEnumConverter) and registered the 5 master-data services.
  • Domain: 3 enums (ItemType, TrackingMode, EntityStatus) + 8 entities (Category, Uom, UomConversion, Item, ItemReorder, Vendor, Warehouse, Bin) with one IEntityTypeConfiguration each; FKs Restrict (masters deactivate, not cascade-delete), unique indexes (SKU, vendor/warehouse code, uom name, bin code per-warehouse), decimal precision, xmin concurrency token on Item/Vendor.
  • API: 5 controllers, lowercase routes matching docs/11 §2 exactly (verified via generated swagger.json). ETag/If-Match (428 if missing, 412 on mismatch), narrow request DTOs (no over-posting), PagedResponse<T> list envelope (§1.4), PageQuery with pageSize clamp ≤200 (B.6).
  • Migration InitialCreate generated (xmin correctly produces no DDL — uses the PG system column).
  • Verified: dotnet build clean (0 warn/0 err); app boots (Now listening… Application started); /api/meta 200; swagger.json 200 with all 13 master-data paths; DI resolves controller→service→repo→DbContext (a DB-backed call reaches Npgsql, failing only on creds).
  • Blocked / follow-ups: (1) auth enforcement + audit trail — §6 (the remaining security gate for [x]); (2) no DELETE master endpoints — MASTER_IN_USE code reserved until transaction tables exist (deactivate-only per FR-MD-08); (3) minor: bad-enum bind error leaks the CLR type name in detail (02-SECURITY B.5) — fine in Dev, tidy before prod.

2026-07-10 — Migration applied + live smoke test PASSED

  • dotnet ef database update applied InitialCreate to local Postgres; /healthHealthy.
  • End-to-end curl smoke across all 5 controllers — all green: warehouse/bin create+list; uom create; category + child + ?tree=true nesting; vendor create + PUT (If-Match 200 / stale 412 / missing 428); item create (201, referencing category/uom/vendor) + GET (ETag header) + list/filter q + pageSize=9999→clamped 200; reorder PUT; uom-conversions PUT; full item PUT with fresh ETag→200; PATCH status Inactive→204; duplicate SKU→400 SKU_DUPLICATE; bad reference→422; missing required→400 ValidationProblemDetails; bad enum→400. Concurrency token (xmin) confirmed incrementing per mutation.
  • Note: local dev DB now holds smoke-test rows (warehouse/bin/uom×2/category×2/vendor/item, item left Inactive). Reset any time with dotnet ef database drop -f && dotnet ef database update.

2026-07-10 — Procurement (§2, minus returns) + cross-cutting foundations

  • Cross-cutting: User entity (+ seeded system user via HasData), ICurrentUser.AuditUserId (numeric actor, system fallback), NumberSequence + NumberSequenceService (atomic per-type/per-year doc numbers issued inside the UoW txn).
  • Procurement: enums (RequisitionStatus, RfqStatus, PurchaseOrderStatus); 8 entities (Requisition/Line, Rfq/Line, VendorQuotation/Line, PurchaseOrder/Line) + configs; DTOs; 3 services; 3 controllers (/requisitions, /rfqs, /purchase-orders). PO carries the xmin ETag token; totals computed server-side; create/edit wrapped in IUnitOfWork.ExecuteInTransactionAsync so the reserved doc number rolls back with the doc.
  • Migration AddProcurement generated + applied (10 tables incl. users/number_sequences; system-user seed; PO xmin emits no DDL).
  • Verified: build clean; app boots; full procurement smoke green (see §2 note) — requisition→submit, RFQ→quotation→comparison, PO create/get/edit/approve/cancel, numbering increment, error paths 409/412/422.
  • Deferred/next: Purchase Return (needs GRN+stock), then §3 GRN, §4 Stock Core (FIFO/ledger), §5 stock transactions. Auth/audit (§6) still the gate for flipping §1/§2 to [x].
  • Housekeeping: an empty user-created migration 20260709124415_initial sits between InitialCreate and AddProcurement (applied, harmless no-op; emits a cosmetic CS8981 lowercase-name warning).